The Contractor shall provide all the: tools, parts, materials, equipment, transportation, and labor of the Facilitate Other Maintenance (FOM) Cage w/Install at Bldg 149 for the Maintenance Support Group (AMXG) at Robins Air Force Base (AFB), Georgia.
Please see the attached files for additional information.
Update: 22 October 2024
The solicitation close date has been extended to Tuesday, 29 October 2024 at 3:00pm EST.
NOTICE OF SITE VISIT OPPORTUNITY
Where: Watson Gate Visitor Center, Robins AFB
When: Friday, 25 October 2024
- Vendors shall meet the Govt POCs at the Visitor Center at 7:30am EST
- All parties will head to the jobsite at 8:30am EST
Govt POCs: Please call the following if there any delays to timely arrival:
- Joe Hendrix: 478-256-2993
- Chris Gilliland: 864-313-6857
Important Information:
- Photos will NOT be allowed.
- Additional documents will NOT be provided. If needed, please bring a printed copy of the documents attached to the original solicitation post on SAM.gov.
- Background checks will be performed during check-in. Any individuals with felonies or warrants that show up will be detained at the gate.
RSVP: Please RSVP NLT Thursday, 24 October 2024 at 12:00pm EST.
- RSVP shall be accomplished by emailing Patrick Hulett at patrick.hulett@us.af.mil using the following format:
Email Title: RSVP_77361 - FOM Cage with Installation
Name:
Business Name:
CAGE Code:
Phone Number:
Number of Attendees:
Name and Phone Number of Each Attendee:
Update: 16 October 2024
The purpose of this update is to extend this combined synopsis/ solicitation. Any questions asked by contractors will be provided below with the answers. Any contractor that has submitted a quote is free to make updates and resubmit by the requested time and date.
FAQ:
- Q: The post will be plated but it is ok to drill the post in the ground and anchor them?
- A: The post plates will be anchored to the floor; posts will not penetrate floor.
- Q: How should the quote be submitted?
- A: Please submit your quote to the primary point of contact listed within this solicitation. PDF or Word document is preferred. Just provide a price based on the line items found within the Letter RFQ, but feel free to provide a more detailed breakdown if preferred.
- Q: What gauge wired is required for the fencing? Will that be 9 gauge?
- A: The Fence will be 9Ga wire.
- Q:Should barb wire be installed at the top of the fence?
- A: No, barb wire is not needed.
- Q:How big should the corner, end, and line posts be? Should the terminal posts all be 3” and line posts 2.5”?
- A: Sizes on the posts are 2 ½” Terminal Post , 2” Line Post & 1 5/8” Top Rail
- Q:Will there only be two man gates?
- A: 2 Ea. 10’ Sliding Gates , 2 Ea. 20’ Sliding Gates , 2 Ea. 3’ Personnel (swinging) Gates
- Q:Should anchors be used to secure the posts in lieu of core drilling into the slab?
- A: All posts will need to be flanged and anchored into the concrete.