Roof Coatings at Canyonlands National Park. Provide and deliver fluid applied roof coating supplies to re-coat an existing Chlorosulfonate Polyethylene (CSPE), also known as Hypalon, single ply membrane roof. Application of the materials will be performed by Park crews. All materials together, when applied as directed, shall provide the Park with a complete and waterproof seal over the existing membrane roof. delivered to Canyonlands National Park HQ. 2282 SW Resource Blvd. Moab, UT 84532. Delivery shall be between 7:00 AM to 5:00 PM Monday through Thursday, no Friday, weekend, or Federal Holiday deliveries will be allowed. Delivery shall be coordinated with Brad Larsen (435) 719-2152. A minimum of 24 hours' notice is required before delivery. The delivery location has a forklift available for off-loading, and access for large trucks.
Period of Performance: 1 March 2025 to 20 March 2025
Park POC: Bradley_Larsen@nps.gov
Contracting POC: Kimberly_Steele@nps.gov