Required Service:
See attachement for detail.
Transportation service for (23) containers of equipment, (1) grader heavy equipment, and (1) roller heavy equipment from Port of Embarkation on Koror, Palau to the North Port of Peleliu, then from North Port of Peleliu to Southern End of Peleliu Airfield. All equipments will arrive at the Port of Malakal in Palau sometime between 30 March 2025 to 11 April 2025. Once all equipments arrive, the contractor will make one movement to deliver all equipments to Peleliu airfield. The period of performance will end once all equipment has safely arrived at Peleliu airfield, as determined by technical point of contact.
Incidental service includes but not limited to, operating, providing, maintaining, material handling and transportation equipment, providing equipment necessary for securing loads, providing competent operators for supporting equipment and refueling equipment, and storage as needed.