The work to be performed shall consist of furnishing necessary labor, tools, transportation, supplies, equipment, materials, and incidentals necessary to complete all work stated in this Performance Work Statement (PWS). The Contractor shall follow all current, applicable codes, regulations, standards, and criteria. The Contractor shall follow all current, applicable codes, regulations, standards, and criteria. In addition, all work procedures and materials shall be approved by the 21 Civil Engineering Squadron (21 CES) Requirements and Optimization (R&O) prior to the start of work.
Repair two of seven of the Harsh Environment Uninterruptible Power Supply (HEU) Lighting Inverters. Replace eight batteries in all seven HEUs. All seven HEUs are to be reprogrammed to operate in normal mode during normal operation, and in emergency mode upon loss of power at Cheyenne Mountain Space Force Station (CMSFS), Colorado.