STATEMENT OF WORK
CGC MOBILE BAY OPFAC: 09-17503 LOCATION: Sturgeon Bay, WI
EQUIPMENT: Barge Crane
COMPONENT AFFECTED: Engineering Study to renew/design outdated obsolete/unrepairable components.
Drawing: APPLETON MARINE_CRANE ASSEMBLY_AMD 852
MPC: NA
POP: 01MAY2025-01June2025
Contractor must design Crane swing drive assembly to renew all obsolete and unrepairable components, restore system back in normal operation once test is completed. Contractor must ensure all connections, fittings, and equipment within the crane system are operating correctly as well.
Any discrepancies found shall be noted; and corrected only if no other cost is needed. If any discrepancy causes cost outside the quote, this shall be routed through customer before discrepancy is corrected.
UNIT POC:
Mobile Bay POC
CWO Josh Deisher
(920) 743-7351
Address:
USCGC Mobile Bay WTGB103
36 S Neenah Ave
Sturgeon Bay
WI 54235