Specifications include, but are not limited to: Provide Scully ST15 overfill protection or equivalent systems for four (4) loading racks/pumps System shall have keyed override for testing and QA operations. Provide connection for existing Thermistor sensors on fuel trucks, 30’ coiled cord with pull‐away socket connection. Shall tie into existing control wiring. System shall adhere to NFPA 407 and all other applicable codes. Any additional equipment, labor, parts, etc to make a fully functional system. The mounting of the systems shall be as follows: At the Main Fuel Farm, two units shall be mounted on a pole (pole provided by awarded contractor) side by side in between the two loading cabinets for Jet‐A Operations. At the South Fuel Farm, one unit shall be mounted on a pole (pole provided by awarded contractor) adjacent to the fueling cabinet for Avgas 100LL operations. At the South Fuel Farm, one unit shall be mounted on a pole (pole provided by awarded contractor) adjacent to fueling cabinet for Jet‐A Operations.