Specifications include, but are not limited to: In general the work consists of the removal and replacement of the existing storm drainage system at 54 the Monona Terrace Parking Ramp (MTR). Scope is limited to the parking ramp drains, pedestrian deck drains, planter drainage, and associated drainage piping on the two parking levels and upper 2 pedestrian level. Each of the two parking ramp levels have approximately 3 160,000 SF and the upper pedestrian level has approximately 9,000 for a total area of 329,000 SF. 4 5 The project provides for the removal and replacement of 11 existing round deck drains and 58 6 catch basin drains; the removal of 7 round deck drains and 13 catch basins that are poorly 7 located; concrete cutting for 4 new catch basins in location where water runs against the 8 buildings; the replacement of all existing corroded storm drainage piping with approximately 9 2,000 LF of PVC drainage piping (including hangers); demolition; concrete infill for 19 10 abandoned drains; traffic coating patching in 83 locations and plaster patching where required. 11 Additionally, the existing underground storm drainage from John Nolen Drive to Lake Monona 12 must be scoped and cleaned prior to completion of the project.