Specifications include, but are not limited to: · Demolition and abandonment of existing pavements, foundations, retaining walls and public utilities. · Soil remediation by excavation and off-site land filling of approximately 20,000 tons of contaminated soils. · Quarry stone streambank reconstruction along approximately 1,500 feet of the north bank and south bank of the Menomonee River. · Excavation, grading and on-site management of low-level contaminated soil along approximately 7 acres of the north bank floodplain of the Menomonee River, and construction of approximately 1,700 feet of earthen levees. · Construction of a 200 linear foot hybrid levee floodwall and 1,150 linear foot concrete floodwall. · Construction of approximately 6,600 feet of 12-inch to 72-inch diameter storm sewer and 350 feet of 120" x 60" Combined Sewer Overflow, including manholes, inlets, cast-inplace structures, and lateral reconnections, seven flap gates ranging from 24-inch to 60-inch, and including two undercrossings of the Canadian Pacific Railway tracks. · Construction of approximately 1,850 liner feet of 16-inch water main, including building services up to the right-of-way line, located on West State Street. · Construction of approximately 2,000 linear feet of concrete encased conduit for City of Milwaukee communication service located in West State Street. · Concrete pavement, asphalt, turf, and native vegetation restoration of all disturbed areas. · Note: Move In and Site Preparation (Bid Item 3) shall not exceed 4% of Total Bid Amount.