Specifications include, but are not limited to: ROOF 1. Safeguard property from falling objects coming from the roof. 2. Remove existing shingles, drip edge, de-icing systems, vents and any damaged or rotted roof sheathing and/or deck board on house. 3. Re-sheet roof with 4'X8'X7/16" OSB 4. Dispose of any cable lines, antenna and satellite dishes, etc. 5. Install new gutter apron in guttered areas and new drip edge on eaves as applicable. Space Gutter apron to receive gutter behind the flashing, or installed gutter when installing gutter apron flashing. 6. Install new 3' wide ice and water shield at base of roof covering gutter apron on roof. Install 18" wide ice and water shield on eaves covering top of drip edge flashing. 7. Install engineered roof barrier/membrane. GAF Shingle Mate or equivalent compatible with chosen roofing system.