Specifications include, but are not limited to: City of Madison is seeking Engineering Services consisting of preliminary design, environmental reporting, final design, plans, specifications and estimates for the reconstruction of Mineral Point Road. Mineral Point Road (MPR) from USH 12 (Beltline) to S. High Point Road (HPR) is proposed to be reconstructed in 2026. The project is anticipated to include the pavement replacement and a significant realignment of the MPR/HPR intersection. A 12’ by 6’ storm sewer box culvert is proposed from the pond in the SE quadrant of MPR/Commerce intersection, under the Beltline to the Greenway on HPR, 500 feet north of MPR. The Box will be designed for the full length, but is intended to only be constructed within the roadway reconstruction limits. Lane configuration/cross section alternative analysis will be explored during the preliminary design phase of the project. Street lighting, Traffic Signals, Local Storm Sewer will be included in the design. The sidewalk on the north side of the roadway is being expanded into a multi-use path as part of the Bus Rapid Transit project in 2024, and that work will not be included in the contract. There may be geometric changes on the path west of Tree Lane that will require reconstruction.