Specifications include, but are not limited to: Prior to removal of existing buildings, the Biloxi Public School District will disconnect all utilities to existing buildings and will provide: • Removal of decks, steps, ramps and awnings • Removal of some skirting to access utilities • Removal of mini split units • Removal of chain link fence for access only The Biloxi Public School District will provide: • A site plan for permitting • Installation of decks, steps, ramps and awnings • Connection of fire alarm systems, intercom systems and IT • All bath accessories and installation of such accessories (including grab bars, mirrors, toilet tissue, paper towel and soap dispensers); Building General Specifications • 2021 IBC, 2023 NEC • 150 MPH wind speed • Perimeter frame • Steel floor joists • ¾” Sturd-I-floor plywood decking – option double 5/8” • VCT floor with rubber base cove – option LVT with rubber base cove • Solid core interior door with closer • 2x6 exterior walls at 16” OC • 2x4 interior walls at 16” OC • Double top plate, single bottom plate