Specifications include, but are not limited to: removal of approximately 17,000 square feet of roof material including insulation, from roof to decking at Roof Areas 1 and 2 and 820 square feet of Built-up Roofing (BUR) at Area 4. Install new flat roof system to be fully adhered Ethylene-Propylene-Diene-Monomer (EPDM) membrane, 60 mils thick. Mechanically fasten (or adhere) new rigid insulation to achieve minimum total R-value of 25. Inspect and clean or replace roof drains as necessary (replace gutters and downspouts). Provide new flashing, pipe boots, counter-flashing, and other roof accessories as required to achieve manufacturer’s 20-year No-Dollar Limit warranty. Provide new roof ladder from Roof Area 2 up to Roof Area 1 as it interferes with gutter system.