Specifications include, but are not limited to: Quarterly Progress Report: • During Engineering and Installation: o Please provide a detailed project progress report, including any departures from the proposed timeline and budget. • During Operations: o Please describe below the project’s implementation success, any challenges that you encountered during the reporting period, and the utilization of infrastructure including the # of vehicles that used the stations and documentation that the stations are meeting the uptime requirements of 97.00% of more. o If milestones and timelines were not met, why not? Did you encounter any challenges during the reporting period which may interfere with meeting the project objectives? How do you propose to remedy any challenges? Data Capture Requirements: Every EV charger is required to have network communications that provide at least the following information: • Date and time of individual charging sessions • Total energy (kWh) for each session • Maximum power (kW) demand for each session • Total dollar amount charged to the user for each session • Charger station status and health in real-time • Error status (malfunction or operating error) • Current price per kWh in real-time Reporting Requirements: Vendor must collect and report the following data at the frequency listed. These requirements are based on the NEVI Standards and Requirements Final Rule. FHWA may also require the Vendor to report this information directly to them once FHWA established guidelines for data submittal. Quarterly Data Submittal (per EVSE charging port, by individual charging sessions): • Charging station location (site name, EVSE ID number, address, city, zip code, county) • Charging station identifier (aligned with NEVI Standards related to Third Party Data Sharing) • Charging port identifier (aligned with NEVI Standards related to Third Party Data Sharing) • Charging session start time and date • Charging session end time and date • Duration of time drawing energy • Error codes associated with an unsuccessful charging session (if applicable) • Energy dispensed (kWh) to the EV • Peak power draw (kW) • Total dollar amount charged to the user