Specifications include, but are not limited to: A. Locate and mark existing underground utilities for safety. B. Scope plumbing for trouble areas within the plumbing system. Identify trouble locations and mark the areas above ground. Ensure staff is notified of marked areas for equipment to be used to avoid any safety concerns. C. Remove all damaged existing piping and install new Acrylonitrile Butadiene Styrene (ABS) bull horn clean-outs and run new ABS piping tying back into the city one way clean out. All piping to have proper grade and proper shielded transition bands. Pipe to be shaded, backfilled with dirt, and properly compacted. Asphalt to be patched to existing grade. D. Re-install all the connections for all piping and restore flow to each connection. Test each connection with water, and ensure the line is open and flowing. E. Contractor shall remove all debris, including packaging material off-site daily. F. Contractor to provide one (1) American with Disability Act (ADA) portable toilet and two (2) portable toilets with a hand washing station for use by CHP staff during construction.