Specifications include, but are not limited to: Site improvements, plumbing, and electrical including the following; provide a structural pad for the new generator including excavation, backfill, erosion control and site restoration; remove existing plumbing and instrumentation inside the building related to pressure monitoring, provide new plumbing including connections to existing water main outside the booster station building to allow relocation of existing pressure monitoring instrumentation; install owner provided generator and automatic transfer switch, provide new pump motor, variable frequency drive, associated conduits and conductors, provide programming at the existing SCADA panel as required to monitor new equipment.