Specifications include, but are not limited to: removal of approximately 16,200 square feet of roof material including insulation, from roof to decking. Install new flat roof system with tapered insulation. Roof system to be fully adhered Ethylene-Propylene-Diene-Monomer (EPDM) membrame, 60 mils thick. Mechanically fasten and adhere new rigid insulation to achieve minimum total R-value of 25. Inspect and clean roof drains. Provide new flashing, pipe-boots, counter-flashing, and other roof accessories as required to achieve manufacturer's 20-year No-Dollar-Limit warranty. Removal of approximately 325 lineal feet of brick masonry (3-courses). Install new through-wall flashing, counterflashing, waterproofing membrane and re-install face brick and mortar with proper weeps. Re-use salvaged brick units. Replacement of any damaged brick during removal to be replaced with new to match existing.