Specifications include, but are not limited to: • Working with URI PM, OPM and project stakeholders, revisit and confirm project vision and project drivers for the URI Athletics Complex renewal project. • Revisit and confirm Space and functional programming requirements identified in the Advanced planning studies for both the East Grandstand at URI Meade Stadium and the running track and field (see attachment A – Option 1 and concept 1 within the Advanced Planning Studies). • Undertake space and functional programming study to define scope for upgrades to the Beck Baseball Field, Soccer field and Softball field and associated utilities and facilities for review and prioritization. • Program revisions/adjustments to align scope of work with budget and schedule. • As a basic service, perform a site survey of the Meade stadium area including sufficient area to include storm water management as the Meade stadium site is adjacent to the White Horn Brook. • As a basic service, perform a site survey of the Athletics fields covering a sufficient area and level of detail to be able to complete the project. • Conceptual design floor plans, sections and elevations. • A minimum of four (4) renderings suitable to illustrate the design for each project and suitable for additional fundraising efforts. • Building Code Review evaluation and report that identifies challenges and variances required. Early stage meeting(s) with RI Building Code Commission for preliminary code feedback. • Construction cost estimates for the work.