Specifications include, but are not limited to: Audio Visual Equipment & Cabling 1. Tag all scheduled and maintainable assets (ID, Make, and Model) 2. Existing elements that apply to this scope of work 3. All elements provided under scope of work of this Bid Package shall be modeled accurately and completely. Any object or collection of objects that occupy more than 1” of space – this includes a ½” conduit with ½” of clearance, or two (2) 5/8” conduits that are run together. 4. All equipment included in this scope of work, including but not limited to security cameras, card readers, information displays, projectors, projector screens, televisions, control panels, conduit, and cable trays. Reference Electrical above for size/LOD requirements. 5. All Scope Supporting Elements, including, but not limited to Cable Tray, Strut, Hangers, stands, sleepers, and seismic support, any zones of influence around hanger attachments and any required clearances for visibility, maintenance and access. Bang-its shall be identified as distinctly different from other hangers. 6. Power feeds, panelboards, pull boxes, and controls 7. Required clearance areas or access zones (modeled as separate semi-transparent, 3D components on their own layer) 8. Any other elements included in this scope of work.