Specifications include, but are not limited to: Lot 1 – Snow Removal Only Costs which are not specifically identified below will not be compensated under any Contract awarded pursuant to this RFB. Bidder may write in or attach additional pricing as necessary. LINE ITEM DESCRIPTION UNIT PRICE 1. Snow plowing (truck, skid steer, tractor, etc.) $____ ____________/HR 2. Snow throwing and/or shoveling $_________________/HR 3. Salt – parking lot, fire lane, driveway $__________ /LB installed 4. Salt – sidewalk, steps, entryways, etc. $__________ /LB installed 5. Snow hauling to offsite Skidsteer (2,500 lbs lift with 8’ Snow Bucket) Wheel Loader (2.5 to 3.0 Yard Bucket) Tri-Axle Truck Quad-Axle Truck Tipping Charge per Load $____________/HR $____________/HR $____________/HR $____________/HR $____________/Load Lot 2 – Lawn Mowing and Landscape Maintenance Only Costs which are not specifically identified below will not be compensated under any Contract awarded pursuant to this RFB. Bidder may write in or attach additional pricing as necessary. Line Item DESCRIPTION UNIT PRICE 1. Lawn Mowing $________________/mow 2. Edge all walks and patios $_________________EA 3. Prune (rejuvenation or shape) all plants $_________________EA 4. Apply fertilizer/herbicide to turf and garden areas $_________________EA 5. Hourly labor for misc. landscaping services (materials installation, weeding, turf repair, planting, etc.) $_________________/HR 6. Enviromulch - Brown $_________________/cubic yard delivered, not installed 7. Enviromulch - Red $_________________/cubic yard delivered, not installed Lot 3 – Snow Removal AND Lawn Mowing and Landscape Maintenance Costs which are not specifically identified below will not be compensated under any Contract awarded pursuant to this RFB. Bidder may write in or attach additional pricing as necessary. This lot is designed for bidders to submit their best pricing under the assumption that the bidder will be awarded both the snow removal and lawn mowing work for WISPIC. This lot will only be awarded if the combined seasonal cost for Lot 3 (lawn mowing plus snow removal) is LESS THAN the sum of the lowest bid for Lot 1 and Lot 2. Line Item DESCRIPTION UNIT PRICE 1. Snow plowing (truck, skid steer, tractor, etc.) $____ ____________/HR 2. Snow throwing and/or shoveling $_________________/HR 3. Salt – parking lot, fire lane, driveway $__________ /LB installed 4. Salt – sidewalk, steps, entryways, etc. $__________ /LB installed 5. Snow hauling to offsite Skidsteer (2,500 lbs lift with 8’ Snow Bucket) Wheel Loader (2.5 to 3.0 Yard Bucket) Tri-Axle Truck Quad-Axle Truck Tipping Charge per Load $____________/HR $____________/HR $____________/HR $____________/HR $____________/Load 6. Lawn Mowing $________________/mow 7. Edge all walks and patios $_________________EA 8. Prune (rejuvenation or shape) all plants $_________________EA 9. Apply fertilizer/herbicide to turf and garden areas $_________________EA 10. Hourly labor for misc. landscaping services (materials installation, weeding, turf repair, planting, etc.) $_________________/HR 11. Enviromulch - Brown $_________________/cubic yard delivered, not installed 12. Enviromulch - Red $_________________/cubic yard delivered, not installed