Specifications include, but are not limited to: Contacting owners to schedule installations, and miscellaneous appurtenances and materials necessary and required to install the new meters and modules, testing, photographs and information collection (including service line material inventory), disposal of the existing meters and storage of materials during the contract period. The selected proposer shall be responsible for all costs associated with the materials, labor and performance of the work. The proposer is only responsible for all plumbing work only as it relates to replacement of the meter, meter gaskets/washers, wire tamper seals, and module endpoints where applicable. The proposer shall replace any faulty meter couplings, flanges, and flange nuts, bolts, and washers. All replacement flanged meter bolt, nuts and washers shall be stainless steel. In the event that there are damages to customer plumbing caused by the proposer during the installation process then the proposer is fully responsible for all repairs and costs. If there is a pre-existing plumbing condition or any other component thereof that is in disrepair preventing the proposer from completing the work, then it should be noted and documented in the work order system as needing repair by the customer before the commencement of work.