Specifications include, but are not limited to: A. This specification section covers the furnishing and installation of a new and complete, low-voltage, Electronic Access Control System (EACS). B. Contractor shall furnish and install access control hardware devices, mounting brackets, power supplies, switches, controls, consoles and other components of the system as required. C. Contractor shall furnish and install access control related software to allow this system expansion. Software includes required license addition for access control readers and electrified portals, workstations and required physical security system Integration. D. Furnish and install outlets, junction boxes, conduit, connectors, wiring, and other accessories necessary to complete the system installation. Requirements shall be in accordance with Division 26. E. Refer to Section 27 60 00 for additional project scope information. F. The Category 6 cabling and patch cords to each required network controller shall be provided by the structured cabling Contractor. Patch cords for the controllers at the network switches shall be installed by the Owner with participation by this Contractor. Patch cords from the controllers to the data jack shall be installed by this Contractor.