Specifications include, but are not limited to: The improvements consist of furnishing all labor and materials for this project. The scope consists of a grade separation at the US 113/ SR 20 intersection located just north of Millsboro, Delaware. The grade separation includes a partial cloverleaf configuration with loop ramps in the northeast and southwest quadrants with signals at the ramp terminals, a bridge structure, drainage improvements, and multimodal facilities. Also, unsignalized median crossovers will be removed on US 113 south of the US 113/ SR 20 intersection within the project's limits. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer.