Specifications include, but are not limited to: Bald Hill Rd (Rt 2) from East Ave (Rt 113) to I-295 Ramps, 0.2 Miles - Pavement Resurfacing Upgrade wheelchair ramps to ADA/PROWAG stds. (approx. 9) Clean existing drainage basins and pipes Repair/replace damaged catch basins (approx. 15) Reconstruct/upgrade Intersection at East Ave (Rt 113); East Ave (Rt 113) from Bald Hill Rd (Rt 2) to Greenwich Ave (Rt 5), 1.3 Miles - Pavement Resurfacing Upgrade wheelchair ramps to ADA/PROWAG stds. (approx. 33) Replace sidewalks (~0.7 Miles) Clean existing drainage basins and pipes Repair/replace damaged catch basins (approx. 75) Reconstruct/upgrade Intersection at CCRI ITS Improvements (DMS and CCTV); Main Ave (Rt 113) from Greenwich Ave (Rt 5) to West Shore Rd (Rt 117), 2.3 Miles - Pavement Resurfacing Sidewalk adjustments around utility poles to meet ADA/PROWAG stds. (approx. 1 location) Upgrade wheelchair ramps to ADA/PROWAG stds. (approx. 68) Repair/Replace/add sidewalks (~1.2 Miles) Clean existing drainage basins and pipes Repair/replace damaged catch basins (approx. 85) Signing & Striping upgrades Implement “Road Diet” from Greenwich Ave to Jefferson Blvd.; West Shore Rd (Rt 117) from Long Street to Oakland Beach Ave, 2.82 Miles - Pavement Resurfacing (except newly paved section from West Greely Circle to Spring Grove Ave – approx. 1.6 mi) Upgrade wheelchair ramps to ADA/PROWAG stds. (approx. 186) Sidewalk adjustments around utility poles to meet ADA/PROWAG stds. (approx. 2 locations) Repair/Replace sidewalks (~1.5 miles) Clean existing drainage basins and pipes Repair/replace damaged catch basins (approx. 109) Signing & Striping upgrades Installation of RRFBs and mid-block crosswalks (2 locations) School zone upgrades (2 locations)