Specifications include, but are not limited to: Auto Tech Room: A. Install new Daikin or equivalent mini split 18,000 BTU, 19 Seer. B. Install new 20-amp breaker in existing panel/run power to disconnect/core through exterior wall and fireproof hole. C. Run lineset along wall in shop room. D. Mount interior blower on the west wall above shelves with a condensation pump. E. Mount condenser on exterior wall above server room condenser with a wall-mounted rack adjacent to server room door. F. Evacuate to proper micron levels. G. Start up and test unit for proper operation. H. Always keep work area free and clear. I. Remove debris daily off CHP property. J. Contractor will provide manufacturer warranty. K. Contractor will provide a one-year workmanship warranty. L. The replacement equipment and installation must be compliant with the California Code of Regulations, Title 24, Part 6, regulations. Server Room: A. Install new Daikin or equivalent mini split 24,000 BTU, 19 SEER B. Install new 20 amp breaker in existing panel/run power to disconnect/core through exterior wall and fireproof hole. C. Run lineset, mount interior blower on north wall. D. Mount exterior condenser on floor adjacent to server room door. E. Evacuate to proper micron levels. F. Start up and test unit for proper operation. G. Always keep work area free and clear. H. Remove debris daily off CHP property. I. Contractor will provide manufacturer warranty. J. Contractor will provide a one-year workmanship warranty. K. The replacement equipment and installation must be compliant with the California Code of Regulations, Title 24, Part 6, regulations