Specifications include, but are not limited to: Work at the site consists of the reconstruction of the existing Union Wharf on Lake Winnipesaukee in Tuftonboro, NH. The existing wharf is approximately 200 feet in length with an average width of 29 feet. The reconstructed wharf is to be designed and constructed such that it meets HS-25 Load Rating and is consistent with ACOE EM 1110-2-1614. The Work generally includes turbidity control, partial removal/disposal of existing wharf as needed, approximately 400 linear feet of sheet piling, cross ties, tie off piles, geotextile fabric, select backfill, 6 foot wide x 200 foot long wooden walkway, in-kind replacement of existing electrical service on the wharf, and other miscellaneous work needed to reconstruct the wharf.