Specifications include, but are not limited to: Crushed hard rock granite (not rotten granite) 3/8” minus with fines, evenly mixed to prevent uneven distribution of fines and coarse material in the trail surface. A sieve analysis for the material must be provided to Lincoln County and will be as follows: 1/2” - 100% passing 3/8” - 96-100% passing #4 - 75-90% passing #8 - 55-75% passing #16 - 35-55% passing #200 - 12-20% passing Location: Approximately 1/3 of the specified material must be hauled to the designated location of the park and ride area of the Lincoln County Wayside for stockpiling (shown on the attached map). Approximately 2/3 yards of the specified material must be hauled to the designated area by the intersection of Highway U and Highway A for stockpiling (shown on the attached map). Other: Contractor will be responsible for providing haul slips showing actual volume for each load hauled.