Specifications include, but are not limited to: In general, the work consists of: repairs to storm sewer collection system including pipe cleaning of approximately 4,000 linear feet of storm sewer ranging in size from 8-inch to 30-inch; removal and replacement of 13 curb inlet structures; resetting of offset manhole frames; installation of 6 new storm manholes; removal and replacement of 1 storm manhole; relay of approximately 250 linear feet of 12-inch storm sewer; installation of approximately 40 feet of new 15-inch storm sewer; spot repair of 5 defects in existing storm sewer; cured-in-place-pipe (CIPP) lining of approximately 300 feet of 15-inch storm sewer; and surface restoration including turf grass, concrete sidewalk, concrete curb and getter, and asphalt pavement.