Specifications include, but are not limited to: Maximum lane closure distance of two miles on the interstates. Minimum seventy two (72) hour notice. Includes all necessary arrows, signs, barrels, barricades, etc. per the Kentucky Standard Drawings. Contractor is responsible for the set up and take down of the bid item lane closures only, the department will be responsible for maintaining the lane closure after set up until take down. Maximum distance of two miles on the interstates. Minimum seventy two (72) hour notice. Includes all necessary arrows, signs, barrels, barricades, etc. per the Kentucky Standard Drawings. Contractor is responsible for the set up and take down of the bid item lane closures only, the department will be responsible for maintaining the lane closure after set up until take down. Must be certified to perform any service necessary including but not limited to flaggers and equipment operators. Equipped to set up per MUTCD and Kentucky Standard Drawing 2012. Minimum seventy two (72) hour notice. Maximum lane closure distance of two miles on the interstates. Minimum seventy two (72) hour notice. Includes all necessary arrows, signs, barrels, barricades, etc. per the Kentucky Standard Drawings. Contractor is responsible for the set up and take down of the bid item lane closures only, the department will be responsible for maintaining the lane closure after set up until take down. Truck Mounted Attenuator (TMA) or Crash Truck with NCHRP TL-3 rated, 65 mph impact speed, crash cushion mounted on a single axle truck with a GVW of 25,950 with Truck mounted arrow panel, type C, solar powered and high intensity strobe lights. Contractor is responsible for the set up and take down of the bid item lane closures only, the department will be responsible for maintaining the lane closure after set up until take down.