Specifications include, but are not limited to: This project is located in Perry County near the community of Bulan KY, at Latitude 37.2966N Longitude -83.1746W. To reach the site from the Intersection of KY Hwy 80 and KY Hwy 15, travel Northeast on KY Hwy 80 3.84 miles to KY Hwy 1146, turn right and continue on KY Hwy 1146 for 1.24 miles to the intersection of KY Hwy 550/476, turn right onto KY Hwy 550/476 and travel 1.00 miles to Indianhead Hollow, turn right onto Indianhead Hollow and travel 0.28 miles to driveway below Combs Residence, turn right onto driveway and travel 0.03 miles to residence below Combs Residence site is directly behind and to the side of residence. This Site will consist of an additional 36 Liner Foot of 6' high Gabion Wall added to the top of existing Gabion wall below the residence, with an additional 84 Liner Foot of 12' high Gabion Wall added at the end of existing Gabion Wall to contain slide below Combs Residence. The construction of 50 Liner Foot of 3' high Concrete Gravity Wall, construction of 80 Liner Foot of Cut-into-Rock 2' Flat Bottom Ditch. Installation of 90 Liner Foot of Class III Ditch-4 foot flat bottom with Grout. The replacement of 40 Linear Foot of 24" HDPE pipe with one Standard Headwall, Silt Checks-Rock will be installed as needed by Scientist on site at appropriate locations. Class II aggregate and filter fabric will be installed behind the wall. Mobilization is setup to provide for construction equipment to be delivered to the site. Hoe Ram hours included if rock encounter during the construction of walls and ditches. Utility Relocation, Site Prep is included, at both the sites and waste area to prep the areas for reclamation and material storage. Residential Seeding are included for all revegetation efforts within the site and waste area. Roadway Stone are included to provide for access during normal reclamation. Bituminous Repair is included to repair "in kind" all asphalt surfaces damage due to normal reclamation activities. Earthwork work bid item is included to excavate material to seat wall and at other areas as directed by the ENGIEER. Material will be transported to an off-site waste area.