Specifications include, but are not limited to: This project consists of professional services to develop a planning study for extending City infrastructure and connecting both existing and future non-City infrastructure to City infrastructure within the USB/UGA of Lewis and Clark County, as identified in the City of Helena 2019 Growth Policy. This infrastructure will include: Water, Wastewater Treatment, Storm Water, and Solid Waste Facilities, and Transportation Systems. At a minimum, the Plan is to include, but not be limited to, the following: A. Existing and Future Growth Patterns Assessment and Development Analysis a. Assess Existing Development b. Estimate and Analyze Future Development in both City and County B. Water And Wastewater Facilities Analysis a. Analyze Existing Water and Wastewater Treatment Facilities i. City ii. Development in USB/UGA b. Describe Current and Projected Water and Wastewater Use Demands i. Existing Demands ii. 5-Year Projections iii. 10-Year Projections iv. 20-Year Projections c. Water Facilities i. Analyze Extension of Main Distribution (Backbone) System to Connect to Existing Development in USB/UGA ii. Analyze Extension of Main Distribution (Backbone) System to Connect to Future City Development and Future Development in USB/UGA iii. Analyze Future Storage