Specifications include, but are not limited to: A. This Section is intended to cover the modernization of one (1) existing Otis geared electric passenger elevator located at City-County Building, 210 Martin Luther King Jr Blvd, Madison, WI. The scope of work includes new traction machine, operation and motion controls, and signal fixtures. This Section indicates the extent of the elevator renovations. B. Work shall include all work and material specified for a complete and first-class installation in every respect, and once started is to proceed without interruption during regular working hours until complete. C. Where a device or part of the equipment is referred to in the singular number, it is intended that such reference shall apply to all devices, unless otherwise indicated. D. Unless specifically identified as “Retain” or “Reuse” in Part 2, provide new equipment. Equipment that is “Retained” or “Reused” shall be reconditioned or renewed to place into satisfactory condition for reuse. Any components not specifically replaced (retained components) shall be cleaned, adjusted, lubricated, refurbished, recalibrated, painted, fasteners tightened, tested, and warrantied. E. Where “Bidder” or “Contractor” is identified, it shall refer to the Elevator Contractor and/or their subcontractors. Where Contractor is directed to “Provide” devices or equipment, such devices or equipment shall be furnished and installed as work under this project. F. Contractor shall provide all labor, elevator equipment, material, transportation, tools and equipment, temporary protection, lubricants and cleaning supplies, employee safety equipment, supervision, coordination, and other work or items required to perform work under this Section, whether or not expressly stated.