Specifications include, but are not limited to: 001 103 0100 CONTRACT BOND L SUM 1. 002 201 0300 CLEARING & GRUBBING ACRE .040 003 201 0370 REMOVAL OF TREES 10IN EA 6. 004 201 0380 REMOVAL OF TREES 18IN EA 2. 005 201 0390 REMOVAL OF TREES 30IN EA 5. 006 202 0105 REMOVAL OF STRUCTURE L SUM 1. 007 202 0132 REMOVAL OF BITUMINOUS SURFACING SY 62. 008 202 0174 REMOVAL OF PIPE ALL TYPES AND SIZES LF 144. 009 203 0101 COMMON EXCAVATION-TYPE A CY 4,093. 010 203 0109 TOPSOIL CY 2,402. 011 203 0140 BORROW-EXCAVATION CY 7,569. 012 210 0099 CLASS 1 EXCAVATION L SUM 1. 013 210 0111 CLASS 2 EXCAVATION L SUM 1. 014 210 0127 CHANNEL EXCAVATION L SUM 1. 015 210 0201 FOUNDATION PREPARATION EA 1. 016 230 0165 SUBGRADE PREPARATION-TYPE A-12IN STA 9.800 017 251 0300 SEEDING CLASS III ACRE 3.060 018 251 2000 TEMPORARY COVER CROP ACRE 3.060 019 253 0101 STRAW MULCH ACRE 6.120 020 255 0103 ECB TYPE 3 SY 18. 021 256 0200 RIPRAP GRADE II CY 801. 022 260 0200 SILT FENCE SUPPORTED LF 150. 023 260 0201 REMOVE SILT FENCE SUPPORTED LF 150. 024 261 0112 FIBER ROLLS 12IN LF 2,135. 025 261 0113 REMOVE FIBER ROLLS 12IN LF 985.