Specifications include, but are not limited to: The new Graduate Dormitory replaces several residences that were destroyed by a tornado in December 2021. The building has a concrete poured in place basement with a wood platformed framed structure with masonry veneer for the first floor. The roof is metal standing seam supported by wood framed truss system. Air conditioning and ventilation systems for the building is comprised of grouped split systems with auxiliary electric heating coils and energy recovery ventilators. Domestic hot water system comprised of natural gas tankless water heaters in parallel functionality equipped with hot water recirculation. The entire building is 8,136 square feet construction type VB. The parti has residence rooms laid linearly connected to a core space. The core of the building includes a living room, dining room, kitchen, pantry, and laundry room.