Specifications include, but are not limited to: The asbestos abatement and removal of other hazardous and non-regulated material work performed under this contract shall consist of the identification, measuring, quantifying, testing and estimating the cost of removal of RACM, Category I and Category II non-friable asbestos containing materials. The hazardous material abatement performed under this contract shall consist of the removal of any hazardous materials on the site to include location, quantity, type and required disposal documentation. Besides asbestos, hazardous materials/universal waste may include but not be limited to: ♦ CFC’s (chlorofluorocarbons) ♦ HCFC’s (hydrochlorofluorocarbons) ♦ Mercury ♦ PCB’s (polychlorinated biphenyls) ♦ Batteries ♦ Oil, petroleum based products ♦ Tires ♦ Tanks (filled of unfilled) ♦ Paints Contractor shall be required to remove, abate and properly dispose of all materials identified in the asbestos inspection report and other materials discovered during demolition. On request, contractor must be able to assist DNS/DPW contractors in abatement of possible additional asbestos containing materials or other hazardous materials when discovered during the demolition process.