Specifications include, but are not limited to: This project involves demolition of Walnut Street Center Stadium, property in the City of Hopkinsville. The structure is currently vacant and. Any physical impediments to the process of demolition are the responsibility of the contractor. The cost of the removal of debris is to be borne by the contractor and the cost included in the bid. The contractor will be responsible for contacting the electrical, natural gas, and other utilities to have service disconnected before any work is done. The lot will be free of debris and restored with dirt fill to conform to the original elevations. The lot must be leveled with no hazardous protrusions (pipes, foundation fragments, rocks, etc. related to the structures), and all disturbed areas properly leveled and seeded with the grass type of which shall be the choice of the City and be covered with a straw mulch layer after work completed. This structure will need to be tested for asbestos, and all asbestos will have to be removed by contractor and certified clean. Therefore, the contractor is responsible for testing and removal of asbestos. There will be two (2) items to be considered in the demolition of the structure by you as a contractor: 1. Asbestos removal required prior to demolition, and wetting or saturation of structure will be required. 2. Due to the age of the building, there may or may not be lead paint on the building.