Specifications include, but are not limited to: The projects consists of: SID 1426 – Arvin Lane - Constructing approximately 270 linear feet of new City street, including asphalt concrete paving, removing and replacing existing concrete curb and gutter, installing new concrete curb and gutter, removing and replacing portions of existing concrete drive approaches and/or driveways, upsizing and replacing the existing 2-inch and 6-inch water main to an 8-inch water main within the City street, as well as landscape restoration, and other miscellaneous gravel street reconstruction improvements. SID 1427 – Hancock Drive - Constructing approximately 210 linear feet of new City street, including asphalt concrete paving, concrete curb and gutter and ribbon curb, installing new concrete approaches and driveways, as well as landscape restoration, and other miscellaneous gravel street reconstruction improvements.