Specifications include, but are not limited to: Prepare the existing material by leveling out areas that hold water or don’t allow water to drain off properly, removing larger stones that appear during the preparation work. Adding a minimum of 6” of non-compacted ¾” minus gravel and grading to establish a crown for water drainage on Groton’s 22,350 feet (4.23 miles) of Town owned railroad bed. See Map. Priority of areas are as follows, limits set by funding: 1. Pine Mt to Little Italy Road 2. Wilson Drive north to Highway 232 3. Coal Kiln Road to Hatch Bridge 4. Powder Spring Road west to first driveway crossing off of Welton Road; Work should commence no earlier than July 1, 2024 or when the new culverts have been replaced, whichever comes first and be completed by 9/1/2024. The contractor is responsible for safety signage. The contractor is responsible for ensuring that all utilities are properly located, marked and identified through utilization of, and compliance with, the requirements of the “Dig Safe” program (30 V.S.A. §7001 et seq.).