Specifications include, but are not limited to: Programming and Pre-Design Services includes: • Analysis of building condition and deferred maintenance review, building code analysis and the impact of such should the building be sprinkled, and any other life safety issues. Accessibility, restroom upgrades, office, and classroom utilization. Re-evaluate the MEP systems, including the condition of piping in walls, existing sanitary, HVAC system and its flexibility/capacity should additional offices be added to the system. Energy efficient lighting systems are to be included. Additionally, review all UND IT components and upgrades for new technologies, wi-fi, access points. Basic Services • Upon approval of the Programming/Pre-Design phase the A/E team will provide the basic services of their typical AIA contract which includes, Schematic Design, Design Development, Construction Documents, Bidding and Contract Administration – all within the Construction Manager at Risk (CMaR) delivery format.