Specifications include, but are not limited to: upgrade the energy and fiber as the existing power panels and network capabilities in the Parking Garage are the original install. An overall condition assessment was performed which indicated the need for updating to current standards after years of normal wear and tear plus numerous modifications to wiring and panel adjustments for various projects over 30+ years. The Parking Garage is also maxed out on power availability. The panels, power (and backup), and network require replacements and routing modifications to support infrastructure improvements that require power or to capture/monitor power (i.e., solar). This includes but not limited to the addition of networked devices via gateways, powered-signage, cameras, pay-on-foot kiosks, EV chargers (and networked system), etc.