Specifications include, but are not limited to: The project involves: Removal and replacement of supply, return, and exhaust ductwork serving three inmate wings in the Lonnie Watson Dorm. The existing multi-zone air handling unit, chiller, and boilers shall remain. New grilles and diffusers will be provided throughout the inmate wings. Fans and ductwork serving the smoke evacuation system will be removed and replaced. New DDC controls will be provided to control the mechanical equipment. Electrical work to support new mechanical equipment will occur. Light fixtures in the inmate wings will be removed and replaced. Sprinklers will be removed and replaced in the inmate wings. Drywall ceilings in two wings and metal security ceilings in one wing will be removed and replaced. Existing insulation in the attic will be removed and replaced with blown insulation. Exterior access panels will be provided in the attic to allow future maintenance access from outside the building. The roof and wood truss system in attic will be reworked to accommodate access points. Truss work will be a delegated design by the contractor. All ductwork and exhaust fans are located in the attic space above the inmate wings; space is restricted. Work will be performed in multiple phases, shutting down only one wing at a time. The work of the Project is considered within the KCIW security boundary. All work must be performed in a sequence effort coordinated with the KCIW.