Specifications include, but are not limited to: The offeror will be required to consult with KDFWR foresters and biologists during all phases of the project to ensure compliance with the terms of our agreement with Daniel Boone National Forest. (DBNF). For this proposal, a professional forestry or environmental company will perform mid-story removal under the following guidelines, 1. During the months of June through January, consultants will hack and spray trees using isopropylamine salt of imazapyr (ARSENAL) with an active ingredient of 28%. This product will be mixed with water as a 22% solution (1-gallon mixture will be 100 ounces of water, 28 ounces of product). a. Trees will be hacked under the following guidelines, 1 hack per 3” DBH per tree. b. When the situation of clusters or pockets of trees of the same species that spread through “sucker” roots, such as beech, only 30% of that cluster needs to be treated. c. A different chemical may only be used after prior approval from KDFWR. 2. During the months of February through May consultants will use a basal bark treatment on smooth barked stems with a 20% herbicide by volume mixture with the active ingredient of triclopyr, Garlon 4. This will be mixed with a commercial basal bark oil. Rough barked stems will be hacked at the rate of 1 hack per 2” DBH using Garlon 3. a. The circumference of trees 6” in diameter or less will be completely covered for the basal bark treatment to a height of 12-15 inches. b. A dye should be used in the basal spray