Specifications include, but are not limited to: 1)The consultant shall complete topographic survey of the project area, which shallinclude, but not be limited to, the county right-of-way, private property boundaries, and easements (Note: Oldham County has access to a 2018 survey from the box culvert to Houston Ln that will be made available to the consultant).2)The consultant may include geotechnical engineering services to investigate rock elevation for construction purposes.3)The consultant shall provide utility coordination services.4)The consultant shall conduct hydrologic and hydraulic design for the 10, 25, and 100-year return events.5)The consultant shall ensure all pipes and channels are designed to carry the 10-yeardesign storm event within the pipe or within the channel banks, respectively.6)The bidder shall ensure all pipes and channels are checked for the 100-year designstorm event. For pipes, the bidder shall confirm containment at levels below the rimopening to prevent surcharging. For channels, the bidder shall ensure no stormwateris permitted to overtop the road, be outside the right-of-way, or be outside thepermanent easement boundaries.7)The scope shall include an investigation of alternative designs (i.e., roadside ditch,curb and gutter, etc.).8)Prepare and submit final (100%) construction plans, calculations, specifications(reference agency if utilizing existing standard specifications such as KYTC or MSD), and construction cost estimate, easement plats (approximately 22), and property acquisition documents. The final (100%) construction plans shall include the following: Cover page, a horizontal and vertical control sheet, plan and profile sheets of the storm sewer system (if applicable), typical cross sections, grading plan, structure restoration and planting plan, erosion control plan, detail sheets, and generaldetails as needed.