Specifications include, but are not limited to: A. Location: The Work locations include, but are not limited to, locations within the right-of-ways on the following easements in the Town of Newington and Town of Durham. 1. Fox Point (Newington) 2. Wagon Hill Farm (Durham) 3. Off Piscataqua Road (Durham) B. Work Included: The Work includes, but is not limited to, the following: 1. Water System Improvements: a. Installation of four (4) water main insertion valves on the existing 20- inch cast iron water mains on both barrels of the Durham-Newington Little Bay water main crossing. b. Installation of three (3) water main tapping sleeves and valves on the existing 24-inch PCCP water main on both sides. c. Disinfection of water mains and appurtenances 2. Testing of water mains and valves for proper installation and performance. 3. All related site work including tree removal, access drive requirements, trench excavation, excavation support, groundwater dewatering, disposal of excess excavated materials, bedding, backfill, compaction, surface restoration, loam/seed and landscaping. 4. Other miscellaneous work shown in the Specifications and site figures for a complete and operational system.