Specifications include, but are not limited to: The Contractor shall provide the following services: A. Clear and remove all overgrown vegetation that is within two (2) feet of fence line. B. Grind 18 stumps on North side of the building. C. Remove electrical conduit and wiring for parking lot lights at South and Southwest portions of fence. Install conduit and wiring after fencing is installed. D. Disconnect conduit from South side of fence (hose clamps) leading to storage shed at Southeast corner during fence removal. Reattach conduit following fence installation. E. Remove approximately 710 linear feet of existing fence from around the CHP secure area and recycle if possible. F. Remove all fence posts and concrete. G. Furnish and install proximately 710 linear feet of new nine (9) gauge galvanized, six (6) foot-high fence. All fencing and gates around rear secure parking lot will have ninety-five (95) percent privacy and protection slats (color will be determined by Area office commander) plus three (3) strand barbed wire and razor wire material. H. Install three (3) strand barbed wire and razor wire on main gate and two (2) pedestrian gates. I. Install new line posts every six (6) feet on center - 2 7/8” schedule 40 set in 12”x 30” footing. J. Top and mid rail - 1 5/8” Schedule 40. K. Install bottom tension wire nine (9) gauge smooth. L. Install combination style lock handset and applicable post/hardware on each of two (2) man gates. M. Maintain a safe working environment to prevent injuries to CHP personnel or damage to CHP property. N. The Contractor, at no expense to the State of California, will repair any damage caused by the Contractor or any of his/her workers. O. The Contractor must field verify all measurements encompassed in this project and is solely responsible for their accuracy. P. The Contractor will keep the work site clean and haul away any work site debris. Removed material must be recycled where possible. Q. Contractor to warranty all parts and workmanship for a period of one (1) year. Contractor to supply the manufacturer’s warranties and manuals for any parts used in this project.