Specifications include, but are not limited to: DEMOLITION REQUIREMENTS A. Demolition and removal of all roofing materials and passage doors as shown on Construction Documents. B. Provide, erect, and maintain temporary barriers and security devices. C. Protect existing landscaping and/or paving that are not to be demolished. D. Perform all other incidental work necessary to fully complete the contract. E. All rubbish, non-reusable fill, debris, equipment, etc., resulting from demolition work shall be removed from the premises during and-or upon completion of work, leaving the site area acceptable to the satisfaction of the owner. F. The contractor shall furnish the disposal site for all demolition materials. G. The contractor shall take whatever steps necessary to control dust during demolition and removal. The contractor will monitor the haul road for debris. FRAMING AND SHEATHING 3.1 FRAMING A. Set structural members level and plumb, in correct position. B. Make provisions for erection loads and for sufficient temporary bracing to maintain structure safe, plumb and in true alignment until completion of erection and installation of permanent bracing. C. Place horizontal members, crown side up. 3.2 SHEATHING A. Secure roof sheathing with longer edge perpendicular to framing members and with ends staggered and sheet ends over bearing. B. Secure sheathing with longer edge perpendicular to framing and with end joints staggered and sheet ends over bearing. Attach with glue and screws. 3.3 TOLERANCES A. Framing Members: 1/4 inch from true position, maximum.