Specifications include, but are not limited to: The Project GFPD EVIDENCE ROOM EXPANSION comprises an addition to the South end of the existing Police Department building. The building will exist independent of the existing building but will have connections for access. The work comprises all trades and disciplines, including site/civil/limited utility work, including site lighting, concrete foundations, slabs, walks and curbs, asphalt paving and landscaping. The building is steel-framed construction with barjoist upper floor framing with concrete slab, steel stairs and metal stud partitions. Exterior finishes are masonry and pre-finished metal panels over continuous insulation. Mechanical, electrical, plumbing and IT/security work is included. Finishes include limited areas of suspended acoustical panel ceilings/lighting with the remaining being painted exposed structure/systems.