Specifications include, but are not limited to: This project includes widening lanes of drive lanes, adding curb and gutter, and multi-use path. Project begins at US60 and extends northerly approximately 1.42 miles to the City Limits line. The project is to construct two lane typical roadway section which includes two 11-foot lanes and 8-foot-wide multi-use path on the west side. Relocation of water line including but not limited to connections of existing lines, fire hydrants and associated valves and construction. Relocation of electrical line and poles from US60 to Wolf Hills Blvd (Sta. 0+00 to 29+00) be by HMPL; the relocated HEMA pole and siren by others and coordinated with the successful contractor. Kenergy will relocate guy anchors at poles from (Sta 42+80 to 58+70). HMG gas line has been relocated by other prior to this project and is included in the bid documents.