Specifications include, but are not limited to: providing all construction supervision, labor, materials, tools, test equipment necessary for the East Frankfort Interceptor Phase III project which includes the installation of approximately 5,000 LF of 42-inch gravity sewers, 985 LF of 66-inch tunnel with 1,026 LF of 48-inch sewer 259 LF of 60-inch sewer, 100 LF of 8-inch sewer, drop shaft structure, and 300 LF of 10-ft hand tunnel, two sets of siphons, three pipes each (one siphon set including 12-inch, 20-inch, and 24-inch pipes approximately 2,700 LF horizontal directional drilled (HDD) under Wilkinson Blvd. and Cove Spring Park and an additional 135 LF of open cut installation, and a second siphon set including 16-inch, 30-inch, and 30-inch pipes approximately 1,500 LF HDD under the Kentucky River and an additional 1,072 LF of open cut installation, precast manholes, a 3 MG prestressed concrete wet weather storage tank, a screening structure, a vortex drop structure, multiple structures with gates and valves, and connection into the E.C. McManis WWTP.