Specifications include, but are not limited to: 1. Provide and install six (6) 4.0 Megapixel minimum Outdoor Day/Night Pan Tilt Zoom (PTZ). 2. Provide and install six (6) 4.0 Megapixel minimum, Outdoor Day/Night 2.8mm minimum or varifocal lens IP camera, Turret Dome Camera. 3. Provide and install six (6) 4.0 Megapixel minimum, Outdoor Day/Night 2.8mm minimum or varifocal lens, Bullet Camera. 4. Provide and install six (6) 4.0 Megapixel minimum, Outdoor Day/Night 2.8mm minimum or varifocal lens, Multi-Sensor Dome Camera. 5. If cameras cannot be hardwired, a point-to-point (PTP) wireless solution can be used with Aruba, Cisco, or Ubiquiti. Contractor will need to verify that power is available and that all required equipment can be installed at the locations needed. 6. Cameras located near vehicle gates need to be of a quality to read vehicle license plates during the day and night. 7. Provide and install Network Video Recorder (NVR) with Video Management Software, USB thumb drives for pulling recordings and NVR must include a minimum of 120 days of storage, at 30 frames per second, or higher. 8. Provide and install two (2) security camera monitor that is commercial grade 50” or larger, Light Emitting Diodes (LED) color monitor or equal with wall mount bracket and wireless keyboard and wireless mouse. 9. Provide and install Cat6 or better cabling to accommodate security system. Equipment shall be rack mountable in the server room and is prohibited from being installed or connected to the CHP network or computer system. Contractor shall not install any software on CHP equipment. If the Area staff requests the Contractor to connect to the CHP network or computer system, Contractor shall immediately contact the CHP Facilities Coordinator for direction. 10. Video Management Software and cameras that are banned for use by US Government sites as stated in the National Defense Authorization Act for 2019, that are manufactured in China (Hikvision, Dahua, Lorex, etc.) will NOT be acceptable. 11. Contractor is responsible to keep work area clean and free of debris. All debris is to be removed off site daily.