Specifications include, but are not limited to: The improvements consist of furnishing all labor and materials for work to include curb and gutter, sidewalk repairs, and/or Bituminous Concrete milling and overlay. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer. This work consists of providing all materials, constructing bituminous concrete speed hump and installing delineators. Construct the speed humps in accordance with Section 401. The plans depict the construction of speed humps in two passes, the Department has obtained satisfactory results in constructing the speed hump through template ramps, which allow the placement of bituminous concrete in one pass. However, regardless of the method used, it shall be the responsibility of the contractor to produce satisfactory results in constructing the speed hump in accordance with the details shown on the Plan.